• Post category:StudyBullet-17
  • Reading time:10 mins read

Diploma in Quantity surveying
Construction Contracts, SMM, Quantity Take-off , BOQ Preparation, Tendering, Variation, Cost Estimation, Claims…..etc

What you will learn

Construction Contracts and Contract Documents

Standard Method of Measurements

Introduction to Planswift Professionals

Understanding of Construction Drawings, Quantity Take-off and BOQ preparation from AutoCAD and PDF files using Planswift Professionals

Tendering Method & Procurement Route

Unit rate preparation based on vendor quotations and Pricing Tenders using Historical Data

Interim Valuation, Variation, Subcontractor Invoices, Claims, Value Engineering, PS, PC and Final Accounts

MS-Excel Techniques and Templates for Quantity Surveyors

Interview Preparation

Description

This course provides an in-depth exploration of the principles, practices, and procedures of Quantity Surveying, with a focus on their practical application in construction projects. Students will learn how to quantify and estimate costs, manage budgets, and control costs in construction projects. They will also develop skills in contract administration, cost planning and procurement, and risk management.

Course Goals:


Get Instant Notification of New Courses on our Telegram channel.


  1. To equip students with an understanding of the role and functions of Quantity Surveying in construction projects.
  2. To provide students with knowledge of various methods of measurement, pricing, and estimating used in Quantity Surveying.
  3. To develop the skills of students in preparing cost plans and budgets, and in monitoring and controlling costs during construction.
  4. To enhance the knowledge and skills of students in contract administration, including preparation of contracts, tendering, and negotiation.
  5. To develop students’ understanding of risk management in construction projects, including identification, assessment, and management of risks.
  6. To familiarize students with modern Quantity Surveying tools and techniques, including software applications.

Course Outline,

  • Standard Method of Measurements.
  • Introduction to Planswift Professionals.
  • Understanding of Construction Drawings, Quantity Take-off and BOQ preparation from AutoCAD and PDF files using Planswift Professionals.
  • Tendering Method & Procurement Route.
  • Unit rate preparation based on vendor quotations and Pricing Tenders using Historical Data.
  • Interim Valuation, Variation, Subcontractor Invoices, Claims, Value Engineering, PS, PC and Final Accounts.
  • MS-Excel Techniques and Templates for Quantity Surveyors.

This course provides students with a solid understanding of the principles, practices, and procedures of Quantity Surveying, and their practical application in construction projects. It equips students with the skills and knowledge necessary to function as competent Quantity Surveyors in the construction industry.

English
language

Content

Introduction

Introduction

Construction contract – Types of contract

Lump Sum Contract
Measure & Value Contracts
Cost Reimbursement Contracts

Form of Contract

Form of Contract
Form of Agreement
Letter of Acceptance
Offer Letter
General & Particular Conditions
FIDIC Red Book

Tendering & Procurement Route

Tendering Methods
Types of Tendering

Standard Method of Measurement

SMM
SMM7
SMM7 – 02
NRM 2
POMI

Take Off with PlanSwift

Introduction to PlanSwift
How to Install PlanSwift
Set Scale
Takeoff Basics

Takeoff 02 : Site Clearance, Excavation , Disposal and Fillings

Read Drawings
Site Clearance
Excavation
Disposal
Filling 01
Filling 02

Takeoff 02 : Concrete Work Sub Structure

Concrete Work Sub Structure

Takeoff 03: Reinforcement – Sub Structure

Footing
Column
Beam

Takeoff 04: Concrete Super Structure

Slab & Beam
Column & Plinth
Lintel & Sill , Coping and FW

Takeoff 05: Masonry Works

Masonry Sub
Masonry Sup
Thermal and moisture protection

Takeoff 06: Door Works and Window, Metal & Wood Works

Door Works and Window
Metal Works
Wood Works

Takeoff 07 : PILE, EXW, LANDSCP, INT & FUR

Pilling 01
Pilling 02
Furnishings
Finishes
Landscape

Application of MS Excel in Quantity Surveying

Basics of Excel
PDF to Excel & Table Creations
Delete Table
Format Painter
Wrap Text
Text to Column
Transpose & Absolute cell reference
Free pans, Filter, Columns and Rows , Remove Duplicate & Hyper link
Serial Numbers, Label and Sheet
Text
Password Protection, Comment and Jump

Applications of Excel in Quantity Surveying 02 : Frequently Used Functions

SUM, Auto Sum & Sub Total
if and Countif
SUMIF
VLOOKUP
Pivot Table
Product, Round and Tim
Concatenate, Conditional Formatting and Link

Application of MS Excel in Quantity Surveying 03

BOQ Preparations
Create Payment Applications
Reinforcement Weight Calculations
Retention Calculation 01
Retention Calculation 02
Quantities in Road Projects

Rate Analysis

Basics Of RA
CTC
Plant & Labour rate
RA Practice
Final BOQ
RA Final Submision

Variations

What is Variation?
Under which circumstances a Variation can arise?
What is the purpose / objective of change management?
FIDIC 1999 Variation Clause
Pro Rata Basis & Method of Interpolation
Variation in Lump sum Contract
Value Engineering, PS, PC & DW