• Post category:StudyBullet-4
  • Reading time:5 mins read




Beginner training tutorials for Primavera P6

What you will learn

 

How to download the latest version of Primavera P6 Professional for free and install it easily without database configuration

 

WBS, Activities and Relationships in Primavera P6

 

Calendars

 

Constraints and Filter

Description

This is a basic Primavera P6 course that demonstrates the fundamentals of using Primavera P6 in project planning and control. Primavera is a monster all-in-one software and it is really important to have a step-by-step structured process on how to use the software from scratch. it is highly recommended to install the primavera P6 and practice while I am delivering the training tutorials to achieve the maximum learning benefits that are intended for this course.

This training is delivered in English. The course covers the below topics:

– How to download the latest version of Primavera P6 Professional for free and install it easily without database configuration.

– Creating and managing Work Breakdown Structure (WBS).

– Creating and managing activities and the associated attributes.

– Types of Calendars and how to use them in Primavera P6

– Schedule Relationships (Types, usages and limitations)

– Understanding Total Float.

– Activity and Project Constraints in Primavera P6.


Get Instant Notification of New Courses on our Telegram channel.


– Copying WBS, activities and relationships.

– Grouping, Sorting and Formatting options.

– Types of filters and how to use them in Primavera P6.

Who is this course for?

– Engineers working in the Construction industry.

– Beginners who want to learn Primavera P6 from scratch.

– Engineers who want to shift their career into project planning and control.

 

English
language

Content

Module 1 – Software Installation and Project Creation
Free Primavera P6 Download and Installation
1. Enterprise Project Structure
2. Organizational Breakdown Structure
3. Create a Project
4. Project Settings
Module 2 – WBS and Activities
5. Create and Manage WBS
6. Add Activity
7. Activity Type
8. Percent Complete Type
9. Activity Steps
10. Create and Manage Calendars
11. Assign Calendars and Fill Down
12. Edit Columns and Time Scale
13. Setting default for new activity
Module 3 – Relationships
14. Assign relationships
15. Delete and Dissolve Activities
16. Total Float
17. Activity Network
18. Activity Constraint
19. Project Constraint
Module 4 – Copying and Formatting
20. Copy Activities, Relationships and WBS
21. Group and Sort
22. Filters
Learn from from Osama
BONUS: More Free P6 Tutorials (Resources, Activity Codes, Global change, etc)